Completed more work on the destroyed building, including:
- More damage to the exterior
- Added structural support (beams and columns)
- Properly lit the main bedroom (using AO and bounce lights)
- UV mapped the exterior and added a plaster texture
Lots more to come. Watch this space!
Posted on Sunday December 6th

